Monday 25 February 2019

Generations (mini) is complete


4 pages to this finish. One full page and 3 partials.  This is my 9th page finish of the year. (Partials included)

I had planned on getting back toWind Moon, but I currently have my house for sale and I packed it away, not anticipating I would complete Generations so quickly.  So I am going to start a little “quick stitch” to tie me over until after the move.  So my little interm project is going to  be...
 ,

QS Bubble by Linda Ravenscroft.  It’s 6 full pages and 3 partials.  Since I am currently participating in a Stitching Olympics where we are only allowed to have one project at a time, I will have to push this in front of Wind Moon.  But this should be fast and I should be back on to Wind Moon by early summer (I hope) and then she will have my full attention.  

I love this little Bubbles pattern. I also have the companion piece, with little sea horses and I hope to hang them in my main bathroom when I’m done. 

Well that’s all the news I have.  I will have to get to a desktop to add the new project to my list on the side, as I can’t seem to do it from an iPad.

Hopefully see you all soon with my first page finish of Bubbles. 



Saturday 16 February 2019

2 More Pages Finished


 
Pages 4 (7938 stitches) and page 5 (1274 stitches) are complete.  Row 1 is now complete.  Just one more full page and three more partials and this baby is done, done, done.

It’s been snowing heavily here, which means that I’ve spent a lot of time stitching. I’m already well into the next pages and I hope to have a project finish in about 3 weeks.  It’s  an ambitious prediction, but I’m up for a good challenge.

There is t really much else to report on, so enjoy the pictures and I hope to see you in 3 weeks.